Foreign Investor Guide
Reference: Presidency of the Republic of Turkey Investment office www.invest.gov.tr
COST OF DOING BUSINESS
FOREIGN INVESTMENT GUIDE
- BUILDING A BUSINESS
 - WORK PERMIT
 - RESIDENCE PERMIT
 - REAL ESTATE AND CITIZENSHIP ACQUISITION
 - COST OF DOING BUSINESS
 - INVESTMENT AREAS
 - TAX GUIDE
 - LEGAL GUIDE
 
- COST OF DOING BUSINESS
 - Monthly Minimum Wage (gross and net)
 
| 
 Monthly Minimum Wage (gross and net)  | 
|
| 
 
  | 
 
  | 
| 
 
  | 
 338,88  | 
| 
 
  | 
 429,01  | 
  | 
 60,06  | 
| 
 · Unemployment insurance fund payment (1%)  | 
 4,29  | 
| 
 · Income tax (15%) *  | 
 22,52  | 
| 
 · Minimum living allowance **  | 
 32,18  | 
| 
 · Stamp tax (0.759%)  | 
 3,26  | 
| 
 Total Amount of Deductions  | 
 90,13  | 
| 
 Cost to Employer  | 
|
| 
 · Gross minimum wage  | 
 429,01  | 
| 
 · Social security premium employer's share (15.5%) ***  | 
 66,50  | 
| 
 · Employer's contribution to unemployment insurance fund (2%)  | 
 8,58  | 
| 
 
  | 
 505,09  | 
| 
 * Calculation of income tax: [(429,01 - 60,06 - 4,29) x 0,15] - 32,18 = 22,52 Data valid from January 1, 2020 to December 31, 2020 1 USD = 6.86 TL (Based on the rate of 1 July 2020)  | 
|
2.Cost of Electricity
| 
 Cost of Electricity  | 
|||||||
| 
 Electricity Sales Tariff for Consumers from Contracted Electricity Supply Companies  | 
|||||||
| 
 
  | 
 Capacity  | 
 Active Energy + Distribution  | 
 
 Reactive Energy  | 
||||
| 
 Within Capacity  | 
 Over Capacity  | 
 Standard  | 
 Day  | 
 Busy Hours  | 
 Night  | 
||
| 
 Kuruş/kWh  | 
 Kuruş/kWh  | 
 Kuruş/kWh  | 
 Kuruş/kWh  | 
 Kuruş/kWh  | 
 Kuruş/kWh  | 
 Kuruş/kWh  | 
|
| 
 Medium voltage  | 
|||||||
| 
 Double Period  | 
|||||||
| 
 Industry  | 
 308,4076  | 
 616,8152  | 
 58,3534  | 
 59,0259  | 
 91,1790  | 
 33,0753  | 
 30,2874  | 
| 
 Single Period  | 
|||||||
| 
 Industry  | 
 YOK  | 
 YOK  | 
 59,1740  | 
 59,8467  | 
 91,9998  | 
 33,8960  | 
 30,2874  | 
| 
 Low Voltage  | 
|||||||
| 
 Single Period  | 
|||||||
| 
 Industry  | 
 YOK  | 
 YOK  | 
 65,6963  | 
 66,3688  | 
 98,5219  | 
 40,4182  | 
 30,2874  | 
| 
 System Usage Tariffs of Private Electricity Suppliers for Consumers *  | 
|||||||
| 
 Capacity  | 
 Distribution Tariff  | 
 Reactive Energy  | 
|||||
| 
 Within Capacity  | 
 Over Capacity  | 
||||||
| 
 Kuruş/kWh  | 
 Kuruş/kWh  | 
 Kuruş/kWh  | 
 Kuruş/kWh  | 
||||
| 
 Medium voltage  | 
|||||||
| 
 Double Period  | 
|||||||
| 
 Industry  | 
 308,4076  | 
 616,8152  | 
 9,2797  | 
 30,2874  | 
|||
| 
 Single Period  | 
|||||||
| 
 Industry  | 
 YOK  | 
 YOK  | 
 10,2502  | 
 30,2874  | 
|||
| 
 Low Voltage  | 
|||||||
| 
 Single Period  | 
|||||||
| 
 Industry  | 
 YOK  | 
 YOK  | 
 15,8592  | 
 30,2874  | 
|||
| 
 Multiple tariff application for November-March period: 07.00-18.00 daytime; 18.00-22.00 peak hours; 22.00-07.00 night. Multiple tariff application for April-October period: 06.00-17.00 during the day; 17.00-22.00 peak hours; 22.00-06.00 night. Including Capacity: The monthly fixed fee calculated per kW over the "contract power" specified in the connection agreement and applied to the two-term consumers connected to the distribution system. Capacity Excess: Monthly fee applied to two-term consumers connected to the distribution system by calculating per kW for the power exceeding the "contract power" specified in the connection agreement. Double Term Tariff: Tariff class consisting of "distribution fee applied over active energy flow (kWh) received from or given to the distribution system" + capacity load calculated per kW specified in the connection contract + capacity excess fee for power (in kW) exceeding the "contract power" . Single Period Tariff: Tariff class applied only for the distribution fee over the active energy flow (kWh) received from or given to the distribution system. * Active energy is not reflected in the table as its price is determined bilaterally between the consumer and the supplier. 
 
 [(Tüketim (kWh) x Active Energy Price * (Kuruş/kWh) x 1,02**) + (Consumption (kWh) x Distribution Tariff (Kuruş/kWh))] x 1,18*** Active Energy Price *: Consumers can buy electricity from contracted electricity supply companies at the prices specified in the table or bilaterally agreed upon with private electricity suppliers. ** Funds (electricity fund 1%, electricity consumption tax 1%) *** VAT 0.18% 
  | 
|||||||
3.Sanayi Amaçlı Su Maliyeti
| 
 Industrial Water Cost  | 
|||||
| 
 
  | 
|||||
| 
 Customer Type  | 
 
  | 
 Waste water  | 
 Water VAT (%)  | 
||
| 
 Industry  | 
 1,76  | 
 Dâhil  | 
 8  | 
||
| 
 
  | 
|||||
| 
 
 Industrial Zones (OIZ)  | 
 Water  | 
 Water VAT (%)  | 
 Waste water  | 
 Waste Water VAT (%)  | 
|
| 
 Eskişehir OIZ  | 
 0,11  | 
 8  | 
 0,10  | 
 8  | 
|
| 
 Antalya OIZ  | 
 0,11  | 
 8  | 
 -  | 
 -  | 
|
| 
 
 Eskişehir Water and Sewerage Administration and Antalya Water and Sewerage Administration 1 USD = 6.86 TL (Based on the rate of 1 July 2020)  | 
|||||
Cost of Natural Gas
| 
 Cost of Natural Gas  | 
||
| 
 
  | 
||
| 
 
  | 
 
  | 
 TL/Sm³  | 
| 
 
  | 
 0,11763647  | 
 1,251652  | 
| 
 OIZ  | 
 0,12638816  | 
 1,393000  | 
| 
 
  | 
 0,13157895  | 
 1,40000  | 
| 
 
 Consumption (Sm³) x (Tariff per Sm³ + 0.023 TL * + Transportation Tariff per Sm³ **) x 1.18 *** * 0,023 TL / Sm³: Special Consumption Tax ** Transportation Tariff / System Usage Tariff (see the websites of the relevant gas distribution companies) *** 0.18% VAT Source: Pipelines and Petrol Transportation Corporation (BOTAŞ) Excluding SCT and VAT  | 
||
5.Broadband Service Fees
| 
 6. Broadband Service Fees  | 
|
| 
 Fibernet and Hipernet  | 
 
  | 
| 
 Download Speed (Mbps) - unlimited tariff  | 
 Price  | 
| 
 Up to 24  | 
 13,84  | 
| 
 Up to 35  | 
 16,02  | 
| 
 Up to 50  | 
 20,39  | 
| 
 Up to 100  | 
 21,85  | 
| 
 Up to 1000  | 
 127,41  | 
| 
 
  | 
 It depends on the needs  | 
| 
 Source: TTNET, Superonline All taxes are included. 1 USD = 6.86 TL (Based on the rate of 1 July 2020)  | 
|